UPDATE – 13th JULY 2016
With respect to Storm Water Drains: Basic works of the pipe laying and connecting to 2nd Main Road Storm Water Drain in 16th Street (Western Side), 17th Street, 23rd Street are completed; needs finishing! Desilting of all the Storm Water Continue reading UPDATE – 13th JULY 2016